MANILA, Philippines — The government is eyeing the filing of charges against the Discayas over poor structural design and unfinished work of the Philippine Film Heritage Building (PFHB) in Intramuros, Manila, Malacañang said Thursday.
Govt eyes charges vs Discayas over 'unfinished' PH Film Heritage Building
Palace Press Officer Claire Castro discovered the sloppy construction of the film center during her inspection of the PFHB that was supposed to be completed Sept. 4, 2025.
Govt eyes charges vs Discayas over 'unfinished' PH Film Heritage Building, This news data comes from:http://www.705-888.com
Castro said the PFHB was built by the Discaya-owned Great Pacific Builders and General Contractor Inc.

"This building should be turned over now because that it's supposedly finished, Sept. 4, 2025. We can see now how it's built and why it's disappointing," Castro told reporters after inspecting the film center.
"And this building, its contractor is Great Pacific Builders and General Contractor Inc. This is one of the corporations of the Discayas," she added.
- Lacson lauds Leviste for arrest of DPWH engineer who offered P360M bribe
- NKorea could produce ten to twenty nukes per year — SKorea leader
- Pagasa monitors LPA off Cavite, may still become tropical depression
- UN watchdog finds uranium traces at suspected Syrian former nuclear site
- Sara’s claims that corruption probe could be done in one day 'absolutely preposterous' – Palace
- Group presses DA on delayed fertilizer subsidies
- ‘God’s Influencer’ to become first millennial saint
- DPWH engineer denies role in Bulacan flood control ‘ghost projects’
- 'Blood Moon' to rise during total lunar eclipse Sunday night
- DPWH Secretary Dizon orders perpetual ban of Wawao Builders, Syms Construction for ghost projects